Opens in a new tab

Project Shaakichiuwaanaan

Shaakichiuwaanaan is PMET RESOURCES’ tier-1 hardrock LCT pegmatite Project in Northern Quebec.

The Opportunity

The Shaakichiuwaanaan Project hosts the largest lithium pegmatite Mineral Reserve in the Americas and is one of the top 10 largest globally. In addition to its world-class lithium potential, the Project hosts some of the world’s largest resources of other critical minerals, including caesium, tantalum, and gallium.

North America’s Largest Lithium Pegmatite Reserve

The Shaakichiuwaanaan Mineral Reserve is the largest lithium pegmatite deposit in the Americas and is one of the top 10 largest globally. In addition to its world-class lithium potential, the Project hosts some of the world’s largest resources of other critical minerals, including tantalum, caesium, and gallium.

Located in Quebec’s Eeyou Istchee James Bay region, the Project is 100% owned by PMET RESOURCES. It offers year-round access via an all-season road and sits just 14 km south of Hydro-Québec’s transmission corridor, ensuring strong infrastructure support. The consolidated land package spans 463 claims covering 23,710 ha and more than 50 km of highly prospective lithium trend along the La Grande Greenstone Belt. Development is carried out in consultation with communities and land users.

PMET released the 2025 lithium-only Feasibility Study on the CV5 Pegmatite for the Shaakichiuwaanaan Property (the “Feasibility Study”) and declared a maiden Mineral Reserve of 84.3 Mt at 1.26% Li2O (Probable)[1]. The study outlines the potential for a competitive and globally significant high-grade lithium project targeting up to ~800 ktpa spodumene concentrate using a simple Dense Media Separation (“DMS”) only process flowsheet. Further, the results highlight Shaakichiuwaanan as a potential North American critical mineral powerhouse with significant opportunity for tantalum and caesium in addition to lithium.

The FS was based on lithium only and did not include other critical metal opportunities such as tantalum and caesium.

The basis for the FS and the qualifications and assumptions made in connection with the FS were disclosed in such technical report filed by the Company in November 2025 on SEDAR+ and on the ASX website.

For the purposes of ASX Listing Rule 5.19, the production target and forecast financial information from the PEA referred to in this Technical Report was reported by the Company in accordance with ASX Listing Rule 5.16 on August 21, 2024.

Project - North America's Largest Lithium Pegmatite Resource
Logo Shaakichiuwaanaan

A Unique Project

Climbing the Mountain Together

Shaakichiuwaanaan is Cree for “climbing up a hill or mountain”. This name evokes a geographical landmark, but it also has a symbolic dimension: the ascent it describes reflects the challenges we must overcome together throughout our journey.

Shaakichiuwaanaan is not only the largest lithium pegmatite deposit in the Americas, but also a flagship Project to demonstrate the value and positive impact of establishing close collaboration with the local Indigenous communities.

Through the Shaakichiuwaanaan Project, PMET is demonstrating its commitment to building lasting partnerships with Indigenous and local communities through shared prosperity and cultural respect.

Shaakichiuwaanaan Project Map

Shaakichiuwaanaan Map

Building North America’s critical-mineral powerhouse

PMET RESOURCES stages

Shaakichiuwaanaan Project - Stage 1 Foundation Phase
Stage 01
Foundation Phase (~400 ktpa, 2.5 Mtpa plant)

Open-pit mining of the cornerstone CV5 spodumene pegmatite

Simple geology and conventional DMS-only processing flowsheet

Supported by existing high-quality transportation infrastructure

Stage 02
Expansion Phase (~800 ktpa, 5.0 Mtpa plant)

Expansion doubles production to ~800 ktpa SC5.5

Incorporates underground mining for early access to the high-grade Nova Zone

Adds a second parallel processing train, identical to Stage 1, for operational flexibility

Shaakichiuwaanaan Project - Stage 2 Expansion Phase
Stage 03
Downstream Opportunity

Potential integration into North American EV supply chains

Establish downstream processing expertise through strategic partnerships

Positions Quebec as a lithium chemicals hub for long-term value creation

The DMS Advantage

DMS: Faster, Cleaner, Smarter Lithium

The DMS-only processing approach planned for Shaakichiuwaanaan delivers faster, cleaner, and lower-cost lithium processing and recovery—making the Project more efficient and scalable.

Highlights:

  • Simple DMS-only processing plant
  • Phased approach could see the installation of a 2.5Mtpa processing plant in Stage 1 and another 2.5Mpta processing plant in Stage 2
  • The conceptual processing flowsheet includes a crushing plant, followed by a DMS-only processing plant, and finally dewatering
  • Average Life of Mine recovery rate expected to be 68.9%

Framing the Opportunity

#1
Largest lithium pegmatite deposit in NA
800 kt
Estimated total production per year
~20 years
Projected mine lifespan

Permitting Pathway

A Proven Path to Success

Shaakichiuwaanaan is being developed under the JBNQA framework, ensuring structured and predictable permitting process.

Shaakichiuwaanaan is located on Category III lands within the Eeyou Istchee Baie-James territory in Quebec, meaning the project falls under the James Bay and Northern Quebec Agreement (JBNQA), which establishes a structured framework for resource development, management, and meaningful consultation with Indigenous peoples.

PMET has worked closely with Cree and local communities from the outset to build strong relationships. The next steps in the process involve submitting an Environmental Impact Assessment (EIA) to both provincial and federal governments. Typical permitting timelines, from EIA submission to project approval, generally range from 9 to 28 months.

Mineral Resource Estimates

Mineral Resource Estimates (MRE-5)

The current Mineral Resource Estimate (MRE-5) re-affirms Shaakichiuwaanaan as hosting one of the largest lithium-tantalum pegmatite Mineral Resources globally as well as the largest caesium (pollucite) pegmatite Mineral Resource globally, cementing its status as a Tier 1, world-class pegmatite critical mineral asset.

Consolidated MRE (CV5, CV13, & CV4 Pegmatites)

  • 113.9 Mt at 1.43% Li2O and 164 ppm Ta2O5 (Indicated) – 4.03 Mt LCE & 18.7 kt Ta2O5
  • 33.8 Mt at 1.24% Li2O and 150 ppm Ta2O5 (Inferred) – 1.03 Mt LCE & 5.1 kt Ta2O5

Caesium Zone MRE (Rigel, Vega, & Helios Zones)

  • 1,844,000 t at 4.40% Cs2O and 0.46% Rb2O (Indicated) – 81,200 t Cs2O
  • 981,000 t at 3.00% Cs2O and 0.37% Rb2O (Inferred) – 29,500 t Cs2O

Consolidated MRE (CV5, CV13, and CV4 pegmatites) reported at a Li2O cut-off grade of 0.40% (open-pit), 0.60% (underground CV5 & CV4), and 0.70% (underground CV13). A grade constraint of 0.50% Cs2O was used to sub-domain the Caesium Zone MRE, contained entirely within CV13 and reported at a 0.50% Cs2O cut-off. The Effective Date is July 10, 2026. Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. Mineral Resources are inclusive of Mineral Reserves.

Shaakichiuwaanaan

Exploration Target

In August 2024, the Company completed an Exploration Target for the Shaakichiuwaanaan Project, which outlines the potential for a district-scale lithium resource.

  • 146 Mt to 231 Mt at 1.0% to 1.5% Li2O.

Subsequent MREs have focused on upgrading of Inferred Resources to Indicated Resources with insignificant change to total resources and, therefore, as of the July 2025 MRE, the scope of the Exploration Target determined is considered to remain relevant. The potential quantity and grade of the Exploration Target are conceptual in nature.

The Exploration Target was completed by BBA Engineering Ltd. (“BBA”), a consultant independent of the Company, and reported in accordance NI 43-101 and with Clause 17 of the JORC Code on August 5, 2024.

The Exploration Target is in addition to (i.e., does not include) the August 2024 MRE and only considers the CV Lithium Trend and immediately proximal areas at the Shaakichiuwaanaan Property.

There has been insufficient exploration to define a Mineral Resource, and it is uncertain if further exploration will result in the Exploration Target being delineated as a Mineral Resource. The Exploration Target has been determined based on the interpretation of a consolidated dataset of surface rock sample descriptions and assays, outcrop mapping and descriptions, drill hole logs and core sample assays, geophysical surveys, and remote sensing data. 

* The Exploration Target information for the Shaakichiuwaanaan Project was compiled and approved by Mr. Darren L. Smith, M.Sc., P.Geo., a Qualified Person under NI 43-101 and a Competent Person under JORC. Mr. Smith is a registered member of the Ordre des Géologues du Québec and the Association of Professional Engineers and Geoscientists of Alberta.

Shaakichiuwaanaan